Skip to content

Before you buy decks & patios leads.

A buying checklist for decks & patios: choose the work, compare costs, check intent and plan the first conversation.

Deck area, height and structural work differ from patio excavation and paving. Establish the intended use and existing site before assigning a project budget.

Elevated structure or ground-level space?

Build around how the customer wants to use the space.

Write down the work you accept, service radius and available capacity before browsing. Assess the customer's actual request against those criteria.

Elevated structure or ground-level space?
Requested workBefore committing estimating time
New decksEstablish: Footprint, height, structure, rails and stairs. Decide whether this fits your team before booking the assessment.
Deck replacementEstablish: Existing supports, material, removal and desired changes. Decide whether this fits your team before booking the assessment.
PatiosEstablish: Area, surface material, base preparation and drainage. Decide whether this fits your team before booking the assessment.
ExtensionsEstablish: Connection to existing work, levels, access and intended use. Decide whether this fits your team before booking the assessment.

Set a budget for the lead you are buying.

Deck & patio leads: $55–$140 for exclusive project inquiries. All amounts are in US dollars.

Set a purchase ceiling from contribution after delivering the job, not from total revenue. Use the lead-cost calculator to estimate leads, paid jobs and revenue from your budget. The industry page has the full channel-by-channel price table.

Check these details before paying.

Read the available project information and use missing scope to decide what needs confirming. Check the original intent timestamp, current purchase price and ownership category.

Check these details before paying.
CheckBuying decision
Service fitNew decks · Patios · Replacement
Location and timingMatch the address or service area and requested timing to your capacity
Original inquiry ageUse the customer's original request date when assessing freshness
Prior accessCheck Normal or Value status and any disclosed prior access
Total acquisition budgetInclude lead cost, contact effort, assessment and estimating

Use the first conversation to resolve the buying decision.

Deck area, height and structural work differ from patio excavation and paving. Establish the intended use and existing site before assigning a project budget.

Ask the customer to describe the requested result in their own words. Compare it with the preview, record any scope changes and agree whether the next step is a call, survey or estimate. Assign an owner and date to that step.

Use the first conversation to resolve the buying decision.
OutcomeRecord and act
Scope matchesConfirm the decision-maker and schedule the next step
Scope is incompleteAsk the specific project questions above before estimating
No replyLog the attempt and use the preferred contact time for follow-up
Material mismatchRecord the discrepancy and review the purchase terms promptly

Compare two buying decisions.

For decks & patios, compare a request that fits your accepted work with one that needs a different service or unavailable appointment. The lower price does not compensate for a job your business cannot deliver.

Worked budget: a $600 contribution per paid job, 20% lead-to-paid-job conversion and $20 sales effort per lead gives a $100 break-even purchase ceiling. At $70 per lead, expected contribution is $30 per purchased lead before overhead. These are planning inputs; use your own costs when setting a purchase ceiling.

Track the same intake group through contact, assessment, quote and paid work. Review acquisition cost after allowing time for the sales cycle. Keep different job types separate so one large project does not hide weak buying decisions.

Read the ownership terms before checkout.

Review the current price and purchase category on the opportunity. For eligible Normal purchases, refund requests with supporting evidence must be submitted within 22 hours of the original successful purchase. Value purchases are non-refundable.

Use the shared ownership and refund guide for the complete process. Record contact attempts and outcomes so a later review has a clear account of what happened.

Common questions

What should I check before buying decks & patios leads?

Deck area, height and structural work differ from patio excavation and paving. Establish the intended use and existing site before assigning a project budget.

Do deck and patio inquiries need the same qualification?

Both need dimensions, material and access. Decks also need height and structural details; patios need surface, base and drainage information.

What helps qualify a deck replacement?

Existing dimensions, height, visible condition, desired material and which parts the customer wants changed.

How should I compare two lead prices?

Match the requested work, service area, original intent age, purchased unit and prior access. Then compare acquisition cost per paid job, including follow-up and estimating.

Find your next opportunity.

Start with your business and the customers you want to reach. Check current access and availability in the portal.

Join Now