A standby installation request needs a property, fuel arrangement and backup priorities. Portable generator shopping should not enter the same installation pipeline.
Permanent installation or equipment shopping?
Keep the project focused on the power the customer needs.
Write down the work you accept, service radius and available capacity before browsing. Assess the customer's actual request against those criteria.
| Requested work | Before committing estimating time |
|---|---|
| Whole-home standby | Establish: Property, intended loads, fuel supply and proposed equipment location. Decide whether this fits your team before booking the assessment. |
| Essential-circuit backup | Establish: Selected circuits, existing panel and outage priorities. Decide whether this fits your team before booking the assessment. |
| Replacement | Establish: Current equipment, transfer arrangement and reason for replacement. Decide whether this fits your team before booking the assessment. |
| Service and maintenance | Establish: Make, model, fault and service history. Decide whether this fits your team before booking the assessment. |
Set a budget for the lead you are buying.
Generator installation leads: $50–$110 for paid-social installation inquiries. All amounts are in US dollars.
Set a purchase ceiling from contribution after delivering the job, not from total revenue. Use the lead-cost calculator to estimate leads, paid jobs and revenue from your budget. The industry page has the full channel-by-channel price table.
Check these details before paying.
Read the available project information and use missing scope to decide what needs confirming. Check the original intent timestamp, current purchase price and ownership category.
| Check | Buying decision |
|---|---|
| Service fit | Standby systems · Replacement · Transfer switches |
| Location and timing | Match the address or service area and requested timing to your capacity |
| Original inquiry age | Use the customer's original request date when assessing freshness |
| Prior access | Check Normal or Value status and any disclosed prior access |
| Total acquisition budget | Include lead cost, contact effort, assessment and estimating |
Use the first conversation to resolve the buying decision.
A standby installation request needs a property, fuel arrangement and backup priorities. Portable generator shopping should not enter the same installation pipeline.
Ask the customer to describe the requested result in their own words. Compare it with the preview, record any scope changes and agree whether the next step is a call, survey or estimate. Assign an owner and date to that step.
| Outcome | Record and act |
|---|---|
| Scope matches | Confirm the decision-maker and schedule the next step |
| Scope is incomplete | Ask the specific project questions above before estimating |
| No reply | Log the attempt and use the preferred contact time for follow-up |
| Material mismatch | Record the discrepancy and review the purchase terms promptly |
Compare two buying decisions.
For generators, compare a request that fits your accepted work with one that needs a different service or unavailable appointment. The lower price does not compensate for a job your business cannot deliver.
Worked budget: a $600 contribution per paid job, 20% lead-to-paid-job conversion and $20 sales effort per lead gives a $100 break-even purchase ceiling. At $70 per lead, expected contribution is $30 per purchased lead before overhead. These are planning inputs; use your own costs when setting a purchase ceiling.
Track the same intake group through contact, assessment, quote and paid work. Review acquisition cost after allowing time for the sales cycle. Keep different job types separate so one large project does not hide weak buying decisions.
Read the ownership terms before checkout.
Review the current price and purchase category on the opportunity. For eligible Normal purchases, refund requests with supporting evidence must be submitted within 22 hours of the original successful purchase. Value purchases are non-refundable.
Use the shared ownership and refund guide for the complete process. Record contact attempts and outcomes so a later review has a clear account of what happened.
Common questions
What should I check before buying generators leads?
A standby installation request needs a property, fuel arrangement and backup priorities. Portable generator shopping should not enter the same installation pipeline.
Is a portable generator inquiry an installation lead?
Only when the customer is requesting installation work. A request to buy portable equipment has a different scope from a permanent standby system.
What information helps prepare a generator survey?
Property details, intended backup loads, existing electrical equipment, fuel supply, equipment location and desired timing.
How should I compare two lead prices?
Match the requested work, service area, original intent age, purchased unit and prior access. Then compare acquisition cost per paid job, including follow-up and estimating.
